Greenwich View Place

On this site in the Isle of Dogs the delivery of 2 diesel engined generators presented a number of difficulties. Our help was requested for a number of tasks. The first was to take delivery of a lorry load of steel beams, the longest beam weighed in at 1500 kgs with a length of 10 metres. The delivery of steel to site is not unusual but this site was an existing office block completed some ten years earlier. To forther complicate matters the steel was required on the first floor of the building. A plan was formed